0124′ 4″ HD gate frameHeavy-duty USA aluminum gate-frame material used to build the two-leaf double-swing structure.
02Inner corner bracketsStructural corner hardware used to keep the frame connections rigid and square during assembly.
046.3 ALU50 T&G panelsInterlocking tongue-and-groove aluminum infill available in wood-look and solid-color finish options.
05Heavy-duty support hardwareIncludes the listed 5″ 2-way support hinge system, 6′ L-shape gate stopper and basic cane bolt.
06Fasteners and finishing piecesIncludes #10 × 1″, #12 × 2″ BK and #10 × 3/4″ screw sizes. Confirm post and cap selection for the final opening.
2.5″ HD aluminum post8-foot heavy-duty aluminum post with flat press cap. Confirm the post selection required for the site.
6′ L-shape gate stopperStop component used to help define the closed position of the double-swing system.
01Continuous horizontal faceInterlocking profiles create a more unified surface with fewer visual interruptions across each leaf.
02Wood-look aluminumWoodgrain finishes bring warmth to the gate while the underlying structural material remains aluminum.
03Contractor-line supportA 4″ heavy-duty frame, support channel, corner hardware and 5″ 2-way hinges are built around regular gate operation.
04Corrosion-resistant materialAluminum avoids iron-oxide rust and provides excellent corrosion resistance for exterior gate applications.
05Non-combustible aluminumThe structural material is non-combustible aluminum with smoke developed listed as 0.
06Custom project optionsCustom colors and custom sizes are available for non-standard project requirements.
01Confirm the openingVerify finished width, height, post or column conditions, swing direction, grade and required operating clearances before assembling either leaf.
02Assemble the HD frameBuild each leaf square using the heavy-duty frame components, inner corner hardware and the fasteners specified for the kit.
03Install the T&G panelsFit the tongue-and-groove profiles so they interlock into the continuous no-gap horizontal surface. Keep both leaves aligned visually.
04Set the hingesInstall and align the heavy-duty 5″ 2-way support hinges so both leaves swing freely without binding.
05Set stops and closing hardwareCoordinate the listed gate stopper and cane bolt with the center meeting condition, latch or lock strategy and actual site grade.
06Final alignmentVerify level, center reveal, closure, fastener tightness and swing clearances on both leaves before putting the gate into regular service.
01Measure finished openingConfirm the clear width and height at multiple points. Do not build the gate from a rough opening assumption.
02Confirm structural supportsPost or masonry conditions need to support the gate leaves, hinge loads and any automation equipment selected for the project.
03Choose finish deliberatelyCoordinate Ipe, Walnut, Yellow Oak, Teak, Black or another available custom finish with surrounding fence, cladding and exterior materials.
04Plan both swing pathsCheck vehicles, slopes, walls, landscaping and grade changes through the full arc of each gate leaf.
05Choose access hardwarePlan latch, lock, cane bolt, center stop and any access-control hardware before the gate is finalized.
06Coordinate automation earlyIf operators are planned, select them based on leaf geometry, weight, wind exposure and the mounting condition rather than adding them as an afterthought.